Stairway under construction. Stepped footings have been completed. Next step: laying concrete block on top of the footings to create the sides of the stairway.
Using a string line to establish a reference for the stairway slope and elevation
Since we had the skid steer for one more day, Steve used the machine to begin cutting a wide terrace just above the top edge of the rip-rap stone. The finished concrete stairway will exit onto this terrace (will post photos of terrace under construction soon).
This is Breeze, Jim Haskin's dog. She comes to see me every day while I'm working down at the shoreline. She's just a puppy. Her favorite game is to grab a tool out of my bag and run off with it. Jim says she's a little clepto. Several of my tools have gone missing since she started coming to visit.