Tuesday, November 12, 2013

Shoreline Stabilization update - Tuesday, Nov. 12

The first two truckloads of rip-rap stone were delivered today  ( the job should take 4 1/2 dump truck loads ). Staged the stone in the driveway. 


From there, we'll move it down to the shoreline with the skid-steer machine.

A family of Mallard ducks stopped by yesterday to check out my progress.

    